SR-805 (Dixie Hwy) over W.P.B. Canal (C-51)

3/4 Miles South of SR-882 · County 099, Florida · Built 1985 · 4 Lanes · 24,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
930373
Year Built
1985
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
25.5 m (83.7 ft)
Lanes
4
Daily Traffic
24,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.