SR-807 Congress Av over L-6 Canal
1.0 mi South of SR-80 · County 099, Florida · Built 2000 · 7 Lanes · 32,500 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
26.661939, -80.088347
This bridge is in worse condition than 78.6% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 26 years old.
Nearby Bridges
SUMMIT BLVD over WPB CANAL C-51
Built 1967
SBSR807 to EBSR80 over C-51 Canal
Built 2002
EBSR80 to SBSR807 over C-51 Canal
Built 2002
NBSR807 to EBSR80 over C-51 Canal
Built 2002
SB SR 807 over EB SR80 & C-51 Canal
Built 2002
NB SR 807 over EB SR80 & C-51 Canal
Built 2002
I 95 SR 9 SB over Summit Boulevard
Built 1975
NB I 95 SR 9 over Summit Boulevard
Built 1975
NB SR 807 over WB SR 80
Built 2002
SB SR 807 over WB SR 80
Built 2002
Bridge Details
- Structure #
- 930466
- Year Built
- 2000
- Length
- 12.1 m (39.7 ft)
- Max Span
- 12.1 m
- Width
- 31.5 m (103.3 ft)
- Lanes
- 7
- Daily Traffic
- 32,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.