SUMMIT BLVD over WPB CANAL C-51
500FT WEST OF I-95 · County 099, Florida · Built 1967 · 4 Lanes · 11,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
26.666022, -80.073992
This bridge is in worse condition than 78.6% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 59 years old.
Nearby Bridges
I 95 SR 9 SB over Summit Boulevard
Built 1975
NB I 95 SR 9 over Summit Boulevard
Built 1975
EB US 98 SR 80 over Stub Canal & S.F.R.C.
Built 2006
WB US 98 SR 80 over Stub Canal & S.F.R.C.
Built 2006
EB US 98 SR 80 over I 95 SR 9
Built 2006
WB US 98 SR 80 over I 95 SR 9
Built 2006
Forest Hill Blvd. over WPB Canal (C-51)
Built 1996
I 95 SR 9 over SR 882 Forest Hill Blvd
Built 1975
NBSR807 to EBSR80 over C-51 Canal
Built 2002
NB SR 807 over WB SR 80
Built 2002
Bridge Details
- Structure #
- 934201
- Year Built
- 1967
- Length
- 90 m (295.3 ft)
- Max Span
- 13 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 4
- Daily Traffic
- 11,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.