Cross Prairie Pkwy over Ditch

1.1m S of CR 525 · County 097, Florida · Built 2021 · 4 Lanes · 8,401 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
924227
Year Built
2021
Length
11 m (36.1 ft)
Max Span
3.4 m
Lanes
4
Daily Traffic
8,401
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.