Neptune Rd/CR-525 over Bass Slough
550ft W of Partin Stl Rd · County 097, Florida · Built 2007 · 4 Lanes · 23,500 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
28.279308, -81.364836
This bridge is in worse condition than 35.2% of bridges in County 097. The average bridge in Florida is 0 years old; this one is 19 years old.
Nearby Bridges
Kings Highway over Partin Canal
Built 1973
Cross Prairie Pkwy over Canal
Built 2018
US-441 over Bass Slough
Built 1965
Neptune Road over Fish Lake Canal
Built 1959
Aultman Road over Partin Canal
Built 1976
Partin Settlement over North Canal to Fish Lake
Built 2016
CR 530 244.9 over SR 91 TPK
Built 1963
SR91NB RMP 244.508 over SR 91 TPK
Built 1963
SR 91 TPK SB 245.6 over BASS SLOUGH
Built 1963
SR 91TPK NB 245.6 over BASS SLOUGH
Built 1963
Bridge Details
- Structure #
- 924204
- Year Built
- 2007
- Length
- 10.4 m (34.1 ft)
- Max Span
- 3.1 m
- Lanes
- 4
- Daily Traffic
- 23,500
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.