SW 168th Street over Cutler Canal C-100-A

300ft. E of SW 78th Ave. · County 086, Florida · Built 1961 · 2 Lanes · 12,852 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
874424
Year Built
1961
Length
26.6 m (87.3 ft)
Max Span
8.8 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
12,852
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.