SB SR5 US-1 over CUTLER DRAIN-CANAL C-100
N OF SW 158 ST · County 086, Florida · Built 1964 · 3 Lanes · 31,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
25.6246, -80.343153
This bridge is in worse condition than 18.4% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 62 years old.
Nearby Bridges
NB SR5 US-1 over CUTLER DRAIN-CANAL C-100
Built 1964
Sub Sec. US1 Bus L over CANAL C-100
Built 1995
SR-992 (SW 152 St) over CANAL C-100
Built 1965
SW 168th Street over Canal C-100
Built 1965
SR-5 NB ( 870016) over CANAL C-100-C
Built 1965
SR-5 SB (870233) over CANAL C-100-C
Built 1965
Sub Sec. US1-Bus L over Canal C-100C
Built 1995
SW 136th St over Canal C-100-C
Built 1972
SW 92nd Ave over Canal C-100-C
Built 1972
SW 82nd Avenue over Canal C-100-C
Built 1966
Bridge Details
- Structure #
- 870015
- Year Built
- 1964
- Reconstructed
- 1970
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 3
- Daily Traffic
- 31,000
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $87,000
- Total Project Cost
- $77,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.