NW 67th Avenue over Biscayne Canal (C-8)
0.3 Mile S of SR-826 · County 086, Florida · Built 1960 · 5 Lanes · 28,291 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
25.921503, -80.309281
This bridge is in worse condition than 94.9% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 66 years old.
Nearby Bridges
SR-826 over NW 67TH AVE (LUDLAM RD.)
Built 1967
NW 77 AVE over BISCAYNE CANAL C-8
Built 1971
SR-826 NB (870102) over CANAL C-8
Built 1959
SR-826 SB (870252) over CANAL C-8
Built 1959
SR-826 over SR-823 (NW 57TH AVE.)
Built 1963
SR-826 over NW 154TH ST
Built 1974
SR-826 SB OFF RAMP over NW 154TH ST
Built 1997
SR-823 over BISCAYNE CANAL C-8
Built 1960
NW 154 ST - W.B. over CANAL C-8
Built 1974
NW 154 ST - E.B. over CANAL C-8
Built 1974
Bridge Details
- Structure #
- 874360
- Year Built
- 1960
- Reconstructed
- 1977
- Length
- 27.5 m (90.2 ft)
- Max Span
- 9.2 m
- Width
- 31.1 m (102 ft)
- Lanes
- 5
- Daily Traffic
- 28,291
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.