SR-826 NB (870102) over CANAL C-8
0.3MI N OF NW 154 ST · County 086, Florida · Built 1959 · 4 Lanes · 64,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
25.9174, -80.325061
This bridge is in worse condition than 70% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 67 years old.
Nearby Bridges
SR-826 SB (870252) over CANAL C-8
Built 1959
NW 77 AVE over BISCAYNE CANAL C-8
Built 1971
SR-826 over NW 154TH ST
Built 1974
SR-826 SB OFF RAMP over NW 154TH ST
Built 1997
NW 154 ST - W.B. over CANAL C-8
Built 1974
NW 154 ST - E.B. over CANAL C-8
Built 1974
NW 67th Avenue over Biscayne Canal (C-8)
Built 1960
SR-826 over NW 67TH AVE (LUDLAM RD.)
Built 1967
SR924WB TO SR826SB over SR-826
Built 1986
I-75 NB over SR-826
Built 1986
Bridge Details
- Structure #
- 870252
- Year Built
- 1959
- Reconstructed
- 1997
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 20.6 m (67.6 ft)
- Lanes
- 4
- Daily Traffic
- 64,500
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.