I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave

E of Midtown Interchange · County 086, Florida · Built 2023 · 1 Lanes · 8,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
871208
Year Built
2023
Length
427.9 m (1403.9 ft)
Max Span
73.5 m
Width
21.9 m (71.9 ft)
Lanes
1
Daily Traffic
8,700
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.