I-395 WB over NW 1st Ct & NE 1st Ave

E of Midtown Interchange · County 086, Florida · Built 2023 · 2 Lanes · 61,500 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
871207
Year Built
2023
Length
144.5 m (474.1 ft)
Max Span
75 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
61,500
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.