SB SR 997 over Miami Canal (C-6)
SR 997 over Miami Canal · County 086, Florida · Built 2016 · 2 Lanes · 9,800 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
25.941528, -80.439714
This bridge is in worse condition than 1.4% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 10 years old.
Nearby Bridges
NB SR 997 over Miami Canal ( C-6)
Built 2016
SR821 HEFT SB 37.3 over Golden Glades Canal
Built 2022
SR821 HEFT NB 37.3 over Golden Glades Canal
Built 2022
SR821 HEFT SB 35.2 over US 27-SR 25 & MIAMI CANL
Built 1973
SR821 SB HEFT 35.2 over US-27 and Miami Canal
Built 2024
SR821 HEFT NB 35.2 over US 27 & MIAMI CANAL
Built 1973
SR821 HEFT NB 35.2 over US-27 & MIAMI CANAL
Built 2022
SR821 HEFT SB 34.7 over FEC RR
Built 1973
SR821 HEFT NB 34.7 over FEC RR
Built 1973
NW 138th St. over Miami Canal
Built 2012
Bridge Details
- Structure #
- 871031
- Year Built
- 2016
- Length
- 35.4 m (116.1 ft)
- Max Span
- 35.4 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.