SR821 HEFT SB 35.2 over US 27-SR 25 & MIAMI CANL

4 miles south of I-75 · County 086, Florida · Built 1973 · 4 Lanes · 48,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
870225
Year Built
1973
Reconstructed
2001
Length
128.3 m (420.9 ft)
Max Span
23 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
48,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.