NW39 - I-95NB SUNP over I-95/I-195 & RAMPS

I-95/SR112/I-195 INTRCHG · County 086, Florida · Built 1991 · 1 Lanes · 4,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
870777
Year Built
1991
Length
275.9 m (905.2 ft)
Max Span
55.9 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
4,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.