NW39 - I-95NB SUNP over I-95/I-195 & RAMPS
I-95/SR112/I-195 INTRCHG · County 086, Florida · Built 1991 · 1 Lanes · 4,100 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
25.812303, -80.208836
This bridge is in worse condition than 84.4% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 35 years old.
Nearby Bridges
I-95 TO SR-836 WB over NW 7TH AVE & SALRR
Built 1969
COMP SR-7 over I-195 (SR-112)
Built 1960
I-95 NB TO I-195WB over I-95 & I-195 & RAMPS
Built 1961
I-195 EB TO I-95SB over US 441 (NW 7 AVE)
Built 1962
SR112EB-I95NB SUNP over SR-112
Built 1991
COMP SR-7 over I-95 RAMP NW 36TH ST
Built 1960
I95SB-SR112WB SUNP over SR-112
Built 1990
I-95 SB over I-195 (SR-112)
Built 1961
I-95 & SR-112 SUNP over I-95 SB
Built 1991
SR-112EB TO I-95NB over SR-112
Built 1961
Bridge Details
- Structure #
- 870777
- Year Built
- 1991
- Length
- 275.9 m (905.2 ft)
- Max Span
- 55.9 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 1
- Daily Traffic
- 4,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.