COMP SR-7 over I-95 RAMP NW 36TH ST
NW 36TH ST INTERCHANGE · County 086, Florida · Built 1960 · 4 Lanes · 26,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
25.813722, -80.206806
This bridge is in worse condition than 70% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 66 years old.
Nearby Bridges
SR112EB-I95NB SUNP over SR-112
Built 1991
I-195 EB TO I-95SB over US 441 (NW 7 AVE)
Built 1962
I-95 & SR-112 SUNP over I-95 SB
Built 1991
I95SB-SR112WB SUNP over SR-112
Built 1990
I-95 NB TO I-195WB over I-95 & I-195 & RAMPS
Built 1961
COMP SR-7 over I-195 (SR-112)
Built 1960
SR-112EB TO I-95NB over SR-112
Built 1961
I-95 SB over I-195 (SR-112)
Built 1961
I-95 SB TO I195 EB over I-195 & 1-95 & RAMPS
Built 1959
I-95 NB over I-195 (SR-112)
Built 1961
Bridge Details
- Structure #
- 870023
- Year Built
- 1960
- Length
- 107.4 m (352.4 ft)
- Max Span
- 19.4 m
- Width
- 19.9 m (65.3 ft)
- Lanes
- 4
- Daily Traffic
- 26,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.