COMP SR-90 over CANAL 12-E
13.68M E COLLIER & MONROE · County 086, Florida · Built 1963 · 2 Lanes · 6,100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
25.761367, -80.673817
This bridge is in worse condition than 18.4% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 63 years old.
Nearby Bridges
COMP SR-90 over FCD CANAL C-12
Built 1962
SR-90 (SW 8th St)
Built 2018
SR-90 SW 8 Street over Canal
Built 2024
SR-90 SW 8 Street over Canal
Built 2024
SR 90
Built 2018
COMP SR-90 over FCD CANAL 12-B
Built 1962
SR-90 SW 8 Street over Canal
Built 2024
IRR BIA RTE 1411 over MICCOSUKEE CANAL
Built 1945
SR 90 (US 41) over US-41 (SR 90)
Built 2013
SR 90 Tamiami trl. over spillway 12-A
Built 1962
Bridge Details
- Structure #
- 870032
- Year Built
- 1963
- Length
- 10.8 m (35.4 ft)
- Max Span
- 2.6 m
- Width
- 18.7 m (61.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.