SR 90 (US 41) over US-41 (SR 90)

22.35M E COLLIER & MONROE · County 086, Florida · Built 2013 · 2 Lanes · 5,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
871035
Year Built
2013
Length
1609.3 m (5279.9 ft)
Max Span
24.4 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
5,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.