NE 62ND ST. over S. FORK CYPRESS WTRWY.

400ft. E of Dixie Hwy · County 011, Florida · Built 1998 · 4 Lanes · 25,367 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
864110
Year Built
1998
Length
13.7 m (44.9 ft)
Max Span
6.9 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
25,367
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.