I-95 (SR-9) SB over Mc Nab Rd.

0.6mi. N of Cypress Ck Rd · County 011, Florida · Built 1976 · 6 Lanes · 125,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
860241
Year Built
1976
Reconstructed
2019
Length
87.2 m (286.1 ft)
Max Span
29.6 m
Width
30.7 m (100.7 ft)
Lanes
6
Daily Traffic
125,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.