CORAL RIDGE DRIVE over CYPRESS CANAL C-14

.7MI S OF W ATLANTIC BLV · County 011, Florida · Built 1989 · 4 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
864098
Year Built
1989
Length
55 m (180.4 ft)
Max Span
11 m
Width
32 m (105 ft)
Lanes
4
Daily Traffic
7,500
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.