SR 869 NB SAW 8.19 over CR 814 ATLANTIC BLVD

At CR 814 Interchange · County 011, Florida · Built 2023 · 5 Lanes · 10,600 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
861017
Year Built
2023
Length
35.4 m (116.1 ft)
Max Span
35.4 m
Width
26 m (85.3 ft)
Lanes
5
Daily Traffic
10,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.