Broward Blvd/SR842 over North Fork New River

0.25 mi East of I-95 · County 011, Florida · Built 2018 · 6 Lanes · 31,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
860675
Year Built
2018
Length
38.5 m (126.3 ft)
Max Span
9.6 m
Width
32.6 m (107 ft)
Lanes
6
Daily Traffic
31,750
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.