EB SR842 to NB I95 over SR-842 (Broward Blvd)

SR-842 & SR-9 · County 011, Florida · Built 1994 · 1 Lanes · 10,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
860598
Year Built
1994
Length
444.6 m (1458.7 ft)
Max Span
64 m
Width
9.5 m (31.2 ft)
Lanes
1
Daily Traffic
10,500
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.