Pembroke Rd over I-75 (SR-93)
1.8 MI. WEST OF SR-823 · County 011, Florida · Built 2016 · 4 Lanes · 20,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
25.993194, -80.340972
This bridge is in worse condition than 3.4% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 10 years old.
Nearby Bridges
SR 820 Pines Blvd over I-75 (SR-93)
Built 1982
Miramar Parkway over I-75
Built 2017
PARK PERIMETER RD over CANAL IN C.B. SMITH PARK
Built 1977
BASS CK MAINT RD over DRAINAGE CANAL
Built 1974
SR821 SB HEFT 40.7 over SNAKE CREEK CANAL
Built 1973
SR821 NB HEFT 40.7 over SNAKE CREEK CANAL
Built 1973
PARK PERIMETER RD over CANAL IN C.B. SMITH PARK
Built 1977
PARK PERIMETER RD over CANAL IN C.B.SMITH PARK
Built 1977
Ramp H4-H12 SB over I-75 SB
Built 2018
SR821 SB HEFT 42.1 over FLAMINGO RD & CANAL
Built 1973
Bridge Details
- Structure #
- 860673
- Year Built
- 2016
- Length
- 139.2 m (456.7 ft)
- Max Span
- 51.9 m
- Width
- 29.3 m (96.1 ft)
- Lanes
- 4
- Daily Traffic
- 20,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.