SR-838 (Sunrise) over Middle River

0.5 Miles East of US-1 · County 011, Florida · Built 2016 · 7 Lanes · 37,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
860669
Year Built
2016
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
29.7 m (97.4 ft)
Lanes
7
Daily Traffic
37,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.