NE 23rd Avenue over Rio Giraldo Canal

0.34 mi. N of SR-842 · County 011, Florida · Built 1968 · 2 Lanes · 2,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
865742
Year Built
1968
Length
29.8 m (97.8 ft)
Max Span
10.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,400
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.