SR-93 (I-75) over Drainage Canal

3.8 mi. east of CR-833 · County 011, Florida · Built 1988 · 4 Lanes · 32,671 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
860534
Year Built
1988
Length
7 m (23 ft)
Max Span
3.4 m
Lanes
4
Daily Traffic
32,671
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.