SR-93 (I-75) NB over DRAINAGE CANAL
7.9Mi East of CR-833 · County 011, Florida · Built 1988 · 2 Lanes · 16,336 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.151464, -80.731172
This bridge is in worse condition than 8.9% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 38 years old.
Nearby Bridges
SR-93 (I-75) SB over DRAINAGE CANAL
Built 1989
IRR NB I-75 (SR93) over Nandos Canal
Built 1988
SB I-75 (SR-93) over Nandos Canal
Built 1967
I-75 (SR-93) NB over L21 CANAL
Built 1988
I-75 (SR-93) SB over L21 CANAL
Built 1967
I-75 (SR-93) NB over DRAINAGE CANAL
Built 1988
I-75 (SR-93) SB over DRAINAGE CANAL
Built 1989
SR-93 (I-75) over Drainage Canal
Built 1988
I75(SR93)Rest Area over C-123 Miami Canal
Built 1999
I-75 (SR-93) NB over C-123 MIAMI CANAL
Built 1988
Bridge Details
- Structure #
- 860448
- Year Built
- 1988
- Length
- 36.6 m (120.1 ft)
- Max Span
- 12.2 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 16,336
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.