NB I-95 (SR-9) over South Fork New River

0.3 miles North of SR-84 · County 011, Florida · Built 1988 · 5 Lanes · 94,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
860431
Year Built
1988
Length
592.8 m (1944.9 ft)
Max Span
91.4 m
Width
25.8 m (84.6 ft)
Lanes
5
Daily Traffic
94,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.