SB I-95 to I-595 over South Fork New River

0.5 Mi S. of SR-736 · County 011, Florida · Built 1987 · 3 Lanes · 14,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
860429
Year Built
1987
Length
592.8 m (1944.9 ft)
Max Span
91.4 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
14,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.