I-75 (SR-93) SB over SOUTH NEW RIVER

0.6 MI N OF GRIFFIN RD · County 011, Florida · Built 1983 · 4 Lanes · 79,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
860354
Year Built
1983
Length
38.9 m (127.6 ft)
Max Span
13.8 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
79,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.