SW 36TH ST over I-75 (SR-93)

0.9MI N OF GRIFFIN RD · County 011, Florida · Built 1984 · 2 Lanes · 7,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
860346
Year Built
1984
Length
125.9 m (413.1 ft)
Max Span
36.6 m
Width
16.3 m (53.5 ft)
Lanes
2
Daily Traffic
7,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.