SHERIDAN ST over I-75 (SR-93)

2.4 Mi W of SR-823 · County 011, Florida · Built 1981 · 11 Lanes · 43,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
860329
Year Built
1981
Reconstructed
2017
Length
122.8 m (402.9 ft)
Max Span
35.7 m
Width
51.6 m (169.3 ft)
Lanes
11
Daily Traffic
43,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.