NB I-95 (SR-9) over Dania Cut-Off Canal
0.7 mi. N of SR-818 · County 011, Florida · Built 1965 · 6 Lanes · 109,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.068208, -80.165408
This bridge is in worse condition than 8.9% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 61 years old.
Nearby Bridges
SB I-95 (SR-9) over Dania Cut-Off Canal
Built 1965
I-95 SB to SR 818 over C-11 Dania Cut-Off Canal
Built 1988
SW 42nd Street over I-95 Ramps & CSX RR
Built 1989
Ravenwood Road over Dania Cut-Off Canal
Built 2016
SB I-95 to Griffin over I-595 to SB I-95 Ramp
Built 1988
I-95 (SR-9) SB over SR-818 (Griffin Road)
Built 1990
I-95 (SR-9) NB over SR-818 (Griffin Rd.)
Built 1989
New Griffin Rd. over Dania Cut-Off Canal
Built 1984
OLD GRIFFIN RD. over C-10 CANAL
Built 1983
NB I-95 TO WB 595 over I-95 I-595 & RR
Built 1990
Bridge Details
- Structure #
- 860209
- Year Built
- 1965
- Reconstructed
- 1989
- Length
- 54.9 m (180.1 ft)
- Max Span
- 24.4 m
- Width
- 29.4 m (96.5 ft)
- Lanes
- 6
- Daily Traffic
- 109,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.