SB I-95 (SR-9) over Dania Cut-Off Canal

1.5mi South of SR-84 · County 011, Florida · Built 1965 · 4 Lanes · 100,750 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
860109
Year Built
1965
Reconstructed
2024
Length
55 m (180.4 ft)
Max Span
24.4 m
Width
27 m (88.6 ft)
Lanes
4
Daily Traffic
100,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.