Taylor Rd over Sweetwater Branch
0.2 Mi. East of SR-421 · County 127, Florida · Built 1962 · 2 Lanes · 18,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.106867, -81.023103
This bridge is in worse condition than 34.2% of bridges in County 127. The average bridge in Florida is 0 years old; this one is 64 years old.
Nearby Bridges
I-95 NB over SR-421
Built 2017
I-95 SB over SR-421
Built 2017
SR-421 over Sweetwater Creek
Built 1995
Esplanade Avenue over B-19 Canal / Trib 1
Built 2010
I-95 NB over Spruce Creek
Built 2017
I-95 SB over Spruce Creek
Built 2017
CR-4009 over Spruce Creek
Built 2010
Willow Run Blvd. over B-19 Canal
Built 1990
I-95 NB over Timothys Ditch
Built 1969
I-95 SB over Timothys Ditch
Built 1969
Bridge Details
- Structure #
- 794010
- Year Built
- 1962
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 18,500
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.