I-95 NB over Spruce Creek
I95 NB 1 Mi S of SR-421 · County 127, Florida · Built 2017 · 3 Lanes · 26,010 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.090867, -81.020919
This bridge is in worse condition than 28.3% of bridges in County 127. The average bridge in Florida is 0 years old; this one is 9 years old.
Nearby Bridges
I-95 SB over Spruce Creek
Built 2017
CR-4009 over Spruce Creek
Built 2010
Taylor Rd over Sweetwater Branch
Built 1962
I-95 NB over SR-421
Built 2017
I-95 SB over SR-421
Built 2017
SR-421 over Sweetwater Creek
Built 1995
Trailwood Drive over Cambridge Canal
Built 2013
Esplanade Avenue over B-19 Canal / Trib 1
Built 2010
Willow Run Blvd. over B-19 Canal
Built 1990
I-95 NB over Timothys Ditch
Built 1969
Bridge Details
- Structure #
- 790227
- Year Built
- 2017
- Length
- 351.1 m (1151.9 ft)
- Max Span
- 29.3 m
- Width
- 18 m (59.1 ft)
- Lanes
- 3
- Daily Traffic
- 26,010
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.