I-95 NB CD over Ramp J2

I95NB over I95SB On Ramp · County 127, Florida · Built 2018 · 3 Lanes · 26,500 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 6 Satisfactory
Substructure 9 Excellent

Location

29.173644, -81.085181

This bridge is in worse condition than 69.2% of bridges in County 127. The average bridge in Florida is 0 years old; this one is 8 years old.

Nearby Bridges

Bridge Details

Structure #
790239
Year Built
2018
Length
20.4 m (66.9 ft)
Max Span
20.4 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
26,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.