I-95 over Beamers Canal

N of Bellevue Overpass · County 127, Florida · Built 1966 · 9 Lanes · 78,500 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
790221
Year Built
1966
Reconstructed
2018
Length
6.3 m (20.7 ft)
Max Span
3 m
Lanes
9
Daily Traffic
78,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.