SR-A1A (VILANO) over TOLOMATO RIV. IWW/VILANO
VILANO BEACH · County 109, Florida · Built 1995 · 2 Lanes · 15,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
29.917808, -81.298733
This bridge is in worse condition than 78.7% of bridges in County 109. The average bridge in Florida is 0 years old; this one is 31 years old.
Nearby Bridges
ENTRANCE RD. over HOSPITAL CREEK
Built 1967
SR-A1A over HOSPITAL CREEK
Built 1956
SR-16 over SAN SEBASTIAN RIVER
Built 2001
SR-A1A (B.O.LIONS) over MATANZAS RIVER IWW
Built 1927
SR-312 WB over MATANZAS RIVER
Built 1999
US-1 (SR-5) over SAN SEBASTIAN RIVER
Built 2013
US-1 BUS. & SR-5A over SAN SEBASTIAN RIVER
Built 1949
DOT ROAD over RED HOUSE BRANCH
Built 1991
SR-5 (US-1) over OYSTER CREEK
Built 2023
LEWIS SPEEDWAY over RED HOUSE BRANCH
Built 1969
Bridge Details
- Structure #
- 780099
- Year Built
- 1995
- Length
- 1170.1 m (3838.9 ft)
- Max Span
- 45.4 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 15,400
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.