US-1 (SR-5) over SAN SEBASTIAN RIVER
IN ST. AUGUSTINE · County 109, Florida · Built 2013 · 4 Lanes · 31,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.892556, -81.322806
This bridge is in worse condition than 47.5% of bridges in County 109. The average bridge in Florida is 0 years old; this one is 13 years old.
Nearby Bridges
US-1 BUS. & SR-5A over SAN SEBASTIAN RIVER
Built 1949
SR-5 (US-1) over OYSTER CREEK
Built 2023
US-1 (SR-5) over OYSTER CREEK
Built 1958
SR-A1A (B.O.LIONS) over MATANZAS RIVER IWW
Built 1927
SR-312 WB over MATANZAS RIVER
Built 1999
SR-A1A over HOSPITAL CREEK
Built 1956
ENTRANCE RD. over HOSPITAL CREEK
Built 1967
SR-16 over SAN SEBASTIAN RIVER
Built 2001
SR-312 over FECRR
Built 1990
SR-312 EB over MATANZAS RIVER
Built 1976
Bridge Details
- Structure #
- 780129
- Year Built
- 2013
- Length
- 232 m (761.2 ft)
- Max Span
- 24.4 m
- Width
- 26.4 m (86.6 ft)
- Lanes
- 4
- Daily Traffic
- 31,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.