Dodd Road over Howell Creek

0.4 Mi S of Red Bug Lake · County 117, Florida · Built 2004 · 4 Lanes · 10,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
774050
Year Built
2004
Length
25.9 m (85 ft)
Max Span
25.9 m
Width
25.6 m (84 ft)
Lanes
4
Daily Traffic
10,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.