Innovation Way over SR-528

0.7Mi S of Monument Pkwy · County 095, Florida · Built 2018 · 8 Lanes · 9,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
754165
Year Built
2018
Length
73.2 m (240.2 ft)
Max Span
38.9 m
Width
46.8 m (153.5 ft)
Lanes
8
Daily Traffic
9,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.