SR-417 NB over SR-528

SR-417 NB - SR-528 · County 095, Florida · Built 1992 · 2 Lanes · 34,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
750468
Year Built
1992
Reconstructed
2023
Length
57.6 m (189 ft)
Max Span
29.7 m
Width
22.4 m (73.5 ft)
Lanes
2
Daily Traffic
34,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.