Clapp Simms Duda over Lake Hart Outfall Canal

1.0 Mile E of CR-15 · County 095, Florida · Built 1961 · 2 Lanes · 26 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
754009
Year Built
1961
Length
24.2 m (79.4 ft)
Max Span
8.5 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
26
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.