Centerline Drive over Jim Branch Creek

500ft N of Luminary Blvd · County 095, Florida · Built 2023 · 2 Lanes · 200 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
755836
Year Built
2023
Length
8.8 m (28.9 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.