SR-528 EB over Econlockhatchee River

SR-528 EB over Econlockha · County 095, Florida · Built 2018 · 2 Lanes · 27,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
750944
Year Built
2018
Length
70.1 m (230 ft)
Max Span
23.3 m
Width
22.3 m (73.2 ft)
Lanes
2
Daily Traffic
27,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.