I-4 (SR 400) over SR 423 (Lee Road)

1 mile N of SR 426 · County 095, Florida · Built 2018 · 10 Lanes · 190,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
750903
Year Built
2018
Length
51.4 m (168.6 ft)
Max Span
51.4 m
Width
60.4 m (198.2 ft)
Lanes
10
Daily Traffic
190,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.