WB I-4 over Riddle Drive
0.6MI W OF LEE RD · County 095, Florida · Built 2020 · 7 Lanes · 111,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
28.596194, -81.385361
This bridge is in worse condition than 8.7% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 6 years old.
Nearby Bridges
I-4 over Riddle Drive
Built 2018
I-4 WB over Wymore Road
Built 2020
I-4 EB & EL over Wymore Road
Built 2018
I-4 WB over SR-426 (Fairbanks Ave)
Built 2020
I-4 (SR 400) EB over SR 426 (Fairbanks Ave)
Built 2018
I-4 WB/I-4 WB EL over Minnesota Avenue
Built 2020
I-4 EB EL over Minnesota Ave
Built 2021
I-4 EB over Formosa & Minnesota Ave
Built 2018
I-4 (SR 400) over SR 423 (Lee Road)
Built 2018
I-4 EB EL over Formosa Ave
Built 2021
Bridge Details
- Structure #
- 750891
- Year Built
- 2020
- Length
- 24.4 m (80.1 ft)
- Max Span
- 24.4 m
- Width
- 40.1 m (131.6 ft)
- Lanes
- 7
- Daily Traffic
- 111,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.