I-4 EB & I-4 EB EL over Gore Street
I-4 EB over Gore Street · County 095, Florida · Built 2019 · 5 Lanes · 82,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
28.53125, -81.385361
This bridge is in worse condition than 26.5% of bridges in County 095. The average bridge in Florida is 0 years old; this one is 7 years old.
Nearby Bridges
I-4 EB to South St over Division Avenue&Gore St.
Built 2019
I-4 WB over Gore Street
Built 2020
I-4 EB over Division Avenue
Built 2019
I4 EB TO 408 EB over I-4
Built 2019
I-4 WB & EL WB over Division Avenue
Built 2020
I-4 EB OFF RAMP over I-4
Built 2019
EB SR-408 TO I4 WB over DIVISION AVENUE
Built 2020
SR-408 EB Ramp C over I-4
Built 2008
408 WB TO I-4 WB over I-4
Built 2020
SR 408 over Division Avenue
Built 2017
Bridge Details
- Structure #
- 750797
- Year Built
- 2019
- Length
- 39.2 m (128.6 ft)
- Max Span
- 39.2 m
- Width
- 31.2 m (102.4 ft)
- Lanes
- 5
- Daily Traffic
- 82,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.